Menu
  • How NEMreview delivers value
    • Analysts
    • Details
    • Clarity
  • Get Started
    • Assess if NEMreview is right for you?
    • Start Small
    • Purchase annual access
    • Log-in to your existing access
  • Need Help?
    • Tips for Use
  • Timeline of Developments
Already have a licence? Login to v7 beta here.

Upgrade to NEM-Review v6.3 released

July 20, 2011
| Version upgrades

1a)  Metered Demand To date, NEM-Review has only re-distributed one measure of demand published by NEMMCO/AEMO.  This was the “Target Demand” as defined in this table. Some time after the market started, NEMMCO/AEMO started also publishing “Metered Demand” (also defined in this table).  With this upgrade, we have: i.  Added Metered Demand into NEM-Review. ii. …

Read More »

Posted in Version upgrades Tagged Metered demand, Metered generation Leave a comment

NEMreview v6 released

July 6, 2010
| Version upgrades

Following from a lengthy development process (where the software was re-written to provide for additional functionality, and numerous beta versions were provided) we formally released NEMreview v6 as v6.2.0

Read More »

Posted in Version upgrades

NEMreview v5 released in July 2006

July 14, 2006
| Version upgrades

It was around July 2006 when NEMreview v5 was released.

Read More »

Posted in Version upgrades

NEMreview v4 released in November 2004

November 9, 2004
| Version upgrades

It was around July 2006 when version 4 of NEMreview was released.

Read More »

Posted in Version upgrades

NEMreview v3 released in 2003

September 24, 2003
| Version upgrades

Back in September 2003 we released NEMreview v3.1.0

Read More »

Posted in Version upgrades

NEMreview first released, as version 1

July 1, 2001
| Version upgrades

It was way back in 2001, I believe, that we first released NEMreview – not long after the commencement of the east-coast focused “National Electricity Market”. At the time I think the product was called “2-Review”.

Read More »

Posted in Version upgrades
  • 3 of 3
  • « Previous
  • 1
  • 2
  • 3

Archives

  • December 2020
  • January 2020
  • June 2019
  • November 2018
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • June 2016
  • March 2016
  • August 2015
  • July 2011
  • July 2010
  • July 2006
  • November 2004
  • September 2003
  • July 2001

Tags

20000 point limit AEMO AEMO (West) Asset Catalog ASX Energy BOM (Bureau of Meteorology) CER Electricity Futures Price Data Electricity Spot Price Data examples of use ez2trend generator production GRC2018 Green Energy Trading Green Prices GSD2019 IMO LGC Prices LGC registration data Metered demand Metered generation Metrics power stations REC Registry RenewEconomy solar PV SWIS (South-West Interconnected System) WattClarity Western Australia
  • Home
  • Get Started
    • Assess if NEMreview is right for you?
    • Log-in to your existing access
    • Purchase annual access
    • Start Small
  • How NEMreview delivers value
    • A logical sequence to help you access the data
      • Step 1 – New Query, or Load Prior/Shared Query
      • Step 2 – Winnow Raw Data
      • Step 3 – Create your Modified Data Series
      • Step 4 – Fetch your Modified Data Series
      • Step 5 – Present your Results
      • Step 6 – Save and Share
    • An easier way to see the big picture of change in the energy sector
    • NEMreview helping clients handle heavy analysis (since 2001)
  • Need Help?
    • Tips for Use
  • Timeline of Developments

© 2018 NEMreview by Global-Roam.